4-10
Power-Up
and
Testing
4.9 Preliminary
System
Check
Before powering up the dispensing system, follow the steps below to make sure there is sufficient
clearance for the dispensing head to operate in the dispensing chamber.
CAUTION!
The following procedures should only be performed by a trained
service technician.
To check Dispensing Head clearance:
1.
With the hood still open, manually move the dispensing head throughout the entire
dispensing chamber making sure that it does not encounter any obstacles during its travel.
2.
Make sure the pneumatic and electrical cables do not impede the dispensing head travel and
are not in danger of being pinched or snagged.
3.
Check the dispensing valve and bracket to make sure that it is mounted securely.
4.
Close the dispensing system hood.
4.10 Component-Level Functional Tests
After initially powering up your dispensing system, all major subsystems must be tested to ensure that
they are ready for operation. This section includes functional tests for the following components:
•
•
Pneumatic Regulators and Gauges
•
•
•
Conveyor and Conveyor Pneumatics
•
Dispensing Head and Accessories
•
•
•
•
•
•
Heater Tooling and Needle Heaters
CAUTION!
The following procedures should only be performed by a trained
service technician.
Summary of Contents for Asymtek Spectrum S-920
Page 2: ......
Page 4: ......
Page 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Page 124: ......
Page 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Page 190: ......
Page 204: ......
Page 208: ......
Page 210: ......
Page 220: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 234: ......