
4-16
Power-Up
and
Testing
Item Description
1 Y-Axis
Control
2 X-Axis
Control
3 Home
Button
Figure 4-11 Conveyor Jog Commands Dialog Box
"
NOTE
For dual conveyor systems, the Conveyor 2 front rail is manually adjustable to allow
pitch variations between Conveyor 1 and Conveyor 2. Both of the rear rails move
synchronously toward the back or front of the machine.
To check fixed-width Conveyor clearance, Safety Interlock, and X-axis movement:
CAUTION!
Perform the following procedure only if your dispensing system has been
configured for an application that requires a fixed conveyor width. DO NOT
perform the procedure for adjustable-width conveyor configurations.
"
NOTE
This procedure assumes that you are already in the FmXP Tools Window. If not, refer to
Steps 2 and 3 in
4.10.5 Conveyor and Conveyor Pneumatics
.
1
2
3
Summary of Contents for Asymtek Spectrum S-920
Page 2: ......
Page 4: ......
Page 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Page 124: ......
Page 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Page 190: ......
Page 204: ......
Page 208: ......
Page 210: ......
Page 220: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 234: ......