
Installation
3-1
3 Installation
3.1 Overview
This section describes installation procedures for the Spectrum Series S-920 Dispensing System and
covers the following topics:
•
Uncrating and Placing the Dispensing System
•
Unpacking the Dispensing Chamber
•
Leveling the Dispensing System
•
•
Setting Up the Service Station
•
•
Installing the Laptop Computer
•
•
Anchoring the Dispensing System
3.2 Safety
First
Operation of your S-920 Dispensing System involves heat, air pressure, electrical power, mechanical
devices, and the use of hazardous materials. It is essential that every person servicing or operating the
dispensing system fully understands all hazards, risks, and safety precautions. Refer to
for additional information.
CAUTION!
Installation procedures should only be performed by a trained service technician.
3.3 Facility
Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Asymtek
Technical Support. See
3.4
Tools and Materials Needed
•
3 mm hex key
•
1/2-inch wrench
•
9/16-inch wrench
•
Phillips Screwdriver (included in tool kit)
•
Band Cutter
•
1 ½-inch wrench (included in tool kit)
•
Personal Protective Equipment
•
Diagonal-cut pliers
•
Hammer
•
Forklift
•
Flat Bar
•
Box Level
Summary of Contents for Asymtek Spectrum S-920
Page 2: ......
Page 4: ......
Page 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Page 124: ......
Page 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Page 190: ......
Page 204: ......
Page 208: ......
Page 210: ......
Page 220: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 234: ......