
Table of Contents
xi
Table of Figures
Figure 1-1
Front View...........................................................................................................................1-8
Figure 1-2
Front View (Open Dispensing Area - Dual Conveyors)......................................................1-9
Figure 1-3
Dispensing Area ...............................................................................................................1-10
Figure 1-4
Service Station..................................................................................................................1-11
Figure 1-5
Front Panel .......................................................................................................................1-12
Figure 1-6
Front Cabinet (Dual Conveyor System shown) ................................................................1-13
Figure 1-7
Rear View .........................................................................................................................1-15
Figure 1-8
Rear View Open ...............................................................................................................1-16
Figure 1-9
Rear Cabinet (Dual Conveyor Configuration Shown).......................................................1-17
Figure 1-10 Rear Panel Connections...................................................................................................1-18
Figure 2-1
Safety Warning Labels (Front Cover) .................................................................................2-7
Figure 2-2
Safety Warning Labels (Front Inside Panel).......................................................................2-7
Figure 2-3
Safety Warning Labels (Dispensing Area) .........................................................................2-8
Figure 2-4
Safety Warning Labels (Conveyor).....................................................................................2-9
Figure 2-5
Safety Warning Labels (Rear)) ...........................................................................................2-9
Figure 2-6
Safety Warning Labels - Power Manager.........................................................................2-10
Figure 2-7
Laser Height Sensor.........................................................................................................2-11
Figure 2-8
EMO/Main Circuit Breaker Locations ...............................................................................2-12
Figure 2-9
Interlock Active Message..................................................................................................2-13
Figure 2-10 Clear Interlock Message...................................................................................................2-13
Figure 2-11 Electrical/Pneumatical Lockout/Tagout ............................................................................2-15
Figure 3-1
Removing the Shipping Brackets .......................................................................................3-2
Figure 3-2
Adjusting the Levelers ........................................................................................................3-3
Figure 3-3
Dispensing Head Stopper Locations ..................................................................................3-5
Figure 3-4
Removing the Z-Head Bracket ...........................................................................................3-5
Figure 3-5
Removing the Service Station Packing Tape .....................................................................3-6
Figure 3-6
Removing the Front Cover .................................................................................................3-6
Figure 3-7
S-920 Dispensing System Scale Stem...............................................................................3-7
Figure 3-8
Leveling the Dispensing System – X-Axis..........................................................................3-8
Figure 3-9
Dispensing System Levelers (Feet)....................................................................................3-8
Figure 3-10 Leveling the Dispensing System – Y-Axis..........................................................................3-9
Figure 3-11 Leveling the Scale ............................................................................................................3-10
Figure 3-12 Replacing the Scale Cover ...............................................................................................3-10
Figure 3-13 Setting up the Weigh Station ............................................................................................3-11
Figure 3-14 Purge Station ....................................................................................................................3-11
Figure 3-15 Installing the Light Beacon ...............................................................................................3-12
Figure 3-16 Windows Explorer - FmXP Directory ................................................................................3-13
Figure 3-17 Dispensing System Serial Number Label.........................................................................3-13
Figure 3-18 Aligning the Laptop Computer to the Tray........................................................................3-14
Figure 3-19 Camera (Rear View).........................................................................................................3-15
Figure 3-20 Anchoring the Dispensing System....................................................................................3-16
Figure 4-1
Main Power Circuit Breaker and Cable ..............................................................................4-2
Figure 4-2 Connecting the Power and Air Supply.....................................................................................4-3
Figure 4-3
FmXP Message 30416 .......................................................................................................4-5
Figure 4-4
FmXP Main Window ...........................................................................................................4-5
Figure 4-5
Setup Conveyor Window ....................................................................................................4-6
Figure 4-6
FmXP - Setup Configuration - Conveyor............................................................................4-7
Figure 4-7
FmXP Scale Setup .............................................................................................................4-8
Figure 4-8
FmXP - Setup Vision ..........................................................................................................4-9
Figure 4-9
Air Regulator and Gauge Locations .................................................................................4-13
Figure 4-10 Dispenser I/O (Outputs 32-63) .........................................................................................4-14
Figure 4-11 Conveyor Jog Commands Dialog Box..............................................................................4-16
Figure 4-12 SMEMA Connections........................................................................................................4-18
Summary of Contents for Asymtek Spectrum S-920
Page 2: ......
Page 4: ......
Page 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Page 124: ......
Page 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Page 190: ......
Page 204: ......
Page 208: ......
Page 210: ......
Page 220: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 234: ......