24
NOTE: If the tube refuses to stay on the sensor apply a piece of tape to
hold it in place.
6.
Aim the sensor perpendicular to the ground. Tighten all the sensor bracket
bolts.
7.
Use a square to adjust the target rod perpendicular to the sensor and to the
boom. The target should be directly under the center of the sensor. Tighten the
ball mount about a half turn past snug.
8.
Check that all the mounting bolts are tight and the dimensional requirements
are satisfied.
9.
After securing the mounting, any excess tube from the mounting bracket and
excess length on the mounting bolts can be cut off.
10.
The target rod can also be shortened. The target must extend at least 2" past
the center of the sensor.
11.
After all procedures are complete, check all dimensional requirements and
tightness of bolts again. If necessary, repeat
STEP 3
through
8
.
IMPORTANT:
Remove the tube alignment fixture (Item M14) after completing main
roll sensor installation.
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...