TABLE OF CONTENTS
1 INTRODUCTION ......................................................................................................................2
2
GENERAL SYSTEM DESCRIPTION.......................................................................................3
3 PARTS
LISTS...........................................................................................................................4
4 INSTALLATION
PROCEDURE .............................................................................................10
4.1 E
XISTING
H
YDRAULIC
S
YSTEM
F
UNCTION
C
HECK
................................................................. 10
4.2 B
OOM
S
PEED
T
EST
............................................................................................................. 11
4.3 W
ING
S
ENSOR
I
NSTALLATION
.............................................................................................. 13
4.4 M
AIN
R
OLL
S
ENSOR AND
T
ARGET
I
NSTALLATION
................................................................. 18
4.4.1 The
Mounting
Brackets ............................................................................................ 18
4.4.2
Mounting on the Boom ............................................................................................ 19
4.5 H
YDRAULIC
I
NSTALLATION
................................................................................................... 25
4.5.1
Valve Assembly and Mounting ................................................................................. 25
4.5.2 Hydraulic
Plumbing .................................................................................................. 29
4.6 E
LECTRICAL
I
NSTALLATION
................................................................................................. 31
4.7 C
OMPLETING THE
I
NSTALLATION
.......................................................................................... 37
5
ELECTRICAL REFERENCE – CABLE DRAWINGS ............................................................38
5.1 I
TEM
C1:
44662B
–
S
ENSOR
T
RUNK
C
ABLE
........................................................................ 38
5.2 I
TEM
C2:
44668
–
S
ENSOR
B
RANCH
C
ABLE
........................................................................ 38
5.3 I
TEM
C3:
44656
–
V
ALVE
C
ABLE
(V
ARIABLE
R
ATE
) ............................................................ 39
5.4 I
TEM
C4:
44651
–
V
ALVE
E
XTENSION
C
ABLE
....................................................................... 39
5.5 I
TEM
C10:
44650-39
–
P
OWER
C
ABLE
G
ENERIC
S
ELF
-
PROPLELLED
.................................... 40
5.6 I
TEM
C11:
44651-03
–
E
XTENSION
C
ABLE
V
ALVE
G
ENERIC
................................................. 41
5.7 I
TEM
C12:
44658-32
–
I
NTERFACE
C
ABLE
........................................................................... 42
5.8 I
TEM
C14:
44658-28
–
I
NTERFACE
C
ABLE
P
OWER
P
IGTAIL
.................................................. 43
5.9 I
TEM
C15B
44658-41
–
I
NTERFACE
C
ABLE
H
AND
C
ONTROL
RG4........................................ 44
5.10 I
TEM
C16:
44658-33
–
I
NTERFACE
C
ABLE
B
YPASS
............................................................ 44
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...