12
manual control of boom functions. In
Section 4.7 Completing the
Installation
, this procedure is repeated with the UC4 System installed for
comparison and troubleshooting purposes.
Table 6 – Boom Test Record (WITHOUT UC4 System)
Working RPM:
Section:
Trial #1
[Seconds]
Trial #2
[Seconds]
Trial #3
[Seconds]
Average
Time
[Seconds]
Left UP
Left
DOWN
Right UP
Right
Down
Main UP
Main
DOWN
Roll
CW
Roll
CCW
Table 7 – Boom Test Record (WITH UC4 System)
Working RPM (Set this the same as in Table 6):
Section:
Trial #1
[Seconds]
Trial #2
[Seconds]
Trial #3
[Seconds]
Average
Time
[Seconds]
Left UP
Left
DOWN
Right UP
Right
DOWN
Main UP
Main
DOWN
Roll
CW
Roll
CCW
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...