
30
7.
Tee
Item H5
in to the open port on
H17
using
Item H18
(
Figure 27
).
8.
Install
Item H2
between the pressure port and the existing pressure line with
Item H14
(
Figure 27
).
9.
Tee
Item H4
in to the open port on
H2
using
Item H19
(
Figure 27
).
10.
Route hoses
H4
and
H5
from the tee(s) to the NORAC valve block to supply
pressure and tank respectively.
Figure 27 – Hydraulic Plumbing at Sprayer Valve Block
NOTE: You must also ensure there are no other orifices present in the
circuit between the NORAC valve block and the boom cylinders.
Some Rogator models have been found to have an orifice in the
boom cylinders.
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...