35
13.
Insert two sets of the Metri-Pack connector tees (
P2A-R2A
and
P2C-R2C
) on
C12
between the matching solenoid valve connections: MAIN UP and MAIN
DOWN. For each tee, the function is labeled on the branch wire.
Figure 36
illustrates where to tee in the MAIN UP and MAIN DOWN connections to the
Rogator valve block.
NOTE: The tee, P2B-R2B (labeled MAIN UP), is not used for this
installation. Leave it unplugged.
Figure 36 – Rogator Valve Block
14.
Unplug the existing
connectors on the
Rogator left and
right boom control
valve connections.
There are four
connectors to
unplug: SV9
(RIGHT UP), SV7
(RIGHT DOWN),
SV10 (LEFT UP)
and SV8 (LEFT
DOWN). Refer to
Figure 37
.
Figure 37 – Solenoid connections for Rogator Valve
Block
15.
Connect four 2-pin Metri-Pack connectors of
C12
(
R2D
,
R2E
,
R2F
and
R2G
) to
the matching connectors of Rogator cable(s), which are unplugged in
STEP
8
.
For each connector, the function (e.g. “LEFT UP”) is labeled on the branch wire
of
C12
.
MAIN DOWN
MAIN UP
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...