31
ROP
4.6 Electrical
Installation
NOTE: While installing the electrical parts of the system you may need to
refer to Section 5 for identification of cables and connectors.
1.
Install the UC4 Control Panel (
Item E1
) in the cab of the sprayer with the
supplied mounting bracket. Mount the panel where it will be clearly visible and
within easy reach of the operator. The location must facilitate connecting the
UC4 power cable (
Item C10
) to the bottom of the UC4 Control Panel.
Generally, a good spot to mount the UC4 Control Panel is on the right hand side
of the cab to the ROP (Roll Over Protection) Bar. Four pilot holes for the screws
provided need to be drilled to facilitate the mounting of the control panel.
Figure 28 – Control Panel Mounting
In the Rogator cab, a
good spot to mount
the UC4 Control
Panel is on the right
hand side of the cab to
the window frame
(
Figure 29
).
Figure 29 – Rogator Control Panel Mounting
NOTE: Sometimes it is convenient to fabricate a bracket of some sort to
mount the panel. Figure 30 shows an example using an angled
bracket.
Summary of Contents for UC4 Total Control
Page 23: ...21 Figure 15 Installation Details ...
Page 30: ...28 Figure 24 General Valve Block Mounting Location Figure 25 Installed NORAC Valve Block ...
Page 41: ...39 5 3 Item C3 44656 Valve Cable Variable Rate 5 4 Item C4 44651 Valve Extension Cable ...
Page 42: ...40 5 5 Item C10 44650 39 Power Cable Generic Self proplelled ...
Page 43: ...41 5 6 Item C11 44651 03 Extension Cable Valve Generic ...
Page 44: ...42 5 7 Item C12 44658 32 Interface Cable ...
Page 45: ...43 5 8 Item C14 44658 28 Interface Cable Power Pigtail ...