
Performing the Initial Hardware Configuration
Nokia 500i Installation Guide
37
!
Make sure the chassis assembly is pushed all the way in from the front of
the gateway.
!
Make sure that power is turned on to the power strip or wall receptacle
that you plugged the gateway in to.
If the fans are still not running, or if the power LED does not illuminate,
contact your Nokia service provider as listed in
page 3 for technical support.
System Status LEDs
You can monitor the basic operation of the gateway and network interface
cards (NICs) by checking their status LEDs. The system status LEDs are
located on the front panel of the gateway.
Figure 5 Status LED Location
00307d
E
SD
CO M M O
N
P
O
IN
T GR O U
N
D
Power status
Fault
Warning
Summary of Contents for 500i
Page 1: ...Nokia 500i Installation Guide Part No N451656001 Rev A Published June 2005 ...
Page 4: ...4 Nokia 500i Installation Guide ...
Page 8: ...8 Nokia 500i Installation Guide ...
Page 10: ...10 Nokia 500i Installation Guide ...
Page 12: ...12 Nokia 50i Installation Guide ...
Page 30: ...1 Overview 30 Nokia 500i Installation Guide ...
Page 42: ...2 Performing the Initial Configuration 42 Nokia 500i Installation Guide ...
Page 70: ...4 Troubleshooting 70 Nokia 500i Installation Guide ...
Page 78: ...B Compliance Information 78 Nokia 500i Installation Guide ...