Petrol Engine System
88
Service Manual – SW900
Engine RPM Check and Adjustment (Continues)
9
Carefully operate and keep operated, the
hopper position microswitch (E) (to simulate the
presence of the hopper)
10 Turn the ignition key to “I” and start the petrol
engine (as shown in the User Manual); wait that
the engine warms up and reaches the target
speed
Warning! Perform the following
procedures with extreme care,
and remind that the petrol
engine is running.
11 Carefully disengage the front fastener and open
the engine compartment hood
12 Carefully loosen the nut (F) and move the lever
(G) as necessary to adjust engine rpm and refer
to the plate (H) for the direction of movement
After adjusting, tighten the nut (F).
Reassembly
13 Turn off the petrol engine (as shown in the User
Manual)
14 Turn the ignition key to “0”
15 Close the engine compartment hood and engage
the front fastener
16 Release the hopper position microswitch (E)
from the forced operation, and check that the
microswitch operates properly
17 Install the hopper by using its transport handle
and wheels
18 Install the rear grid (A) by engaging the
fasteners and then tighten the upper mounting
screw (B)
P200285
Summary of Contents for SW900
Page 13: ...General Information 13 Service Manual SW900 Machine Nomenclature SW900 B Continues P200252 ...
Page 14: ...General Information 14 Service Manual SW900 Machine Nomenclature SW900 B Continues P200253 ...
Page 15: ...General Information 15 Service Manual SW900 Machine Nomenclature SW900 B Continues P200254 ...
Page 17: ...General Information 17 Service Manual SW900 Machine Nomenclature SW900 P Continues P200256 ...
Page 18: ...General Information 18 Service Manual SW900 Machine Nomenclature SW900 P Continues P200257 ...
Page 19: ...General Information 19 Service Manual SW900 Machine Nomenclature SW900 P Continues P200258 ...
Page 23: ...General Information 23 Service Manual SW900 Dimensions P200259 ...