41
Left box is for installer check off and the right box is for
customer check off.
❑ ❑
1.
The gate has been checked to make sure it is level and moves freely
in both directions.
❑ ❑
2.
Potential pinch areas have been guarded so as to be inaccessible
OR have contact and/or non-contact obstruction sensing devices
installed.
❑ ❑
3.
The installer has installed one or more contact or non-contact
obstruction sensing devices, in compliance with UL325 requirements
for this installation.
❑ ❑
4.
If pedestrian traffic is expected, a separate pedestrian gate has been
installed, a minimum of seven feet from the gate. The customer has
been informed that all pedestrian traffic must use the pedestrian
gate.
❑ ❑
5.
Warning signs have been installed on each side of the gate in highly
visible locations. The customer has been informed that these signs
must remain at all times.
❑ ❑
6.
There are no controls installed on the gate operator, or within 8 feet
of the gate.
❑ ❑
7.
The installer has properly adjusted the obstruction sensing
feature and has tested the gate to make sure that the gate stops
and reverses a short distance with minimal resistance applied
(Approximately 40 lbs. on a swing gate, at the end of the gate.
❑ ❑
8.
The installer has instructed the customer in the proper use of
the gate operator and reviewed all of the operational functions,
obstruction sensing devices, warning beeper and reset, etc.
❑ ❑
9.
The installer has instructed the customer in the proper use of the
operator’s manual disconnect feature. The manual disconnect must
never be used while the gate is in motion. The power switch must be
turned off before using the manual disconnect and disengaging the
operator.
❑ ❑
10.
The installer has reviewed all safety instructions with the customer,
and has left the safety instructions and owner’s information sheets
for their reference.
❑ ❑
11.
The installer has answered any questions the customer has
regarding the operation of the gate operator and gate operator
safety precautions.
❑ ❑
12.
The The installer has explained to the customer that a regular
maintenance schedule for both the gate and the gate operator is
recommended.
Installation Acceptance
Address where opener is located
Installer name, number and address
End user name and telephone number
38 - INSTALLATION CHECKLIST