14
1.
Remove top cover assembly by unlocking the lid with the supplied key.
2.
Turn lid counterclockwise then remove.
3.
Remove side bolts and covers to access interior for installation
1
2
3
3
1
2
2
Figure 3 - COVER REMOVAL
11.1 - Step one-location
Locate the area in which the opener shall be located.
11.2 - Step two-concrete
Fabricate a concrete pad structure sufficient to stabilize and mount the gate
opener. Please consult the local building dept. and/or a structural engineer to
build a concrete pad that meets building codes and is sufficient for the soil
type and climate.
6”
24”
20”
x 4
BELOW
THE FROST
LINE CHECK
ALL LOCAL
CODES (30”)
Figure 4 - SAMPLE LAYOUT
11 - INSTALLATION PROCEDURES (CONT.)
11.3 - Step three-physical mounting
Drill and insert RedHead (1/2” x 3 1/3”) concrete anchors into the concrete
sufficient to properly mount the gate opener. Mounting position must
be a minimum distance of 21 inches distance between the gate and any
obstructions as shown to the left. Open the top cover using the supplied
key. Remove the top and side covers to gain access to mounting holes. (See
figure 3) Set the unit in place and attach wiring as indicated in the wiring
section 9.0 wiring and connections of this manual (see Figure 4).
MAKE SURE ALL POWER IS DISCONNECTED PRIOR TO ANY
SERVICE OR INSTALLATION.
Figure 5 - WIRING
11.4 - Step four-manual release
Having removed the top cover, locate the manual release handle. Insert and
turn the manual release handle clockwise until the turret assembly is loose
and moves freely. The main drive assembly is now disengaged and the gate
turret may be operated by hand.
Figure 6 - MANUAL RELEASE