7.5 Performance Testing
CA5350
7-4
7.5 Performance Testing
Performance testing is conducted as part of preventive maintenance to prevent
performance degradation of the
CA5350
. Besides, conduct it if needed after acceptance
inspection, periodic inspection or repair.
If the result of a performance testing does not meet the specifications, calibration or
repair is required. Contact NF Corporation or one of our representatives.
The performance testing should be conducted in the following conditions.
Power voltage:
AC100V / 120V / 220V / 240V ±10% (however, 250V or less)
Ambient temperature: 23±5C°
Ambient humidity:
5 to 85%RH, non-condensing
Warm up:
30 min or more
In performance testing, the measurement instrument and jig requires the following.
DC voltmeter :
Accuracy ± (0.05% +0.1 mV) at 10V range
BNC-BNC Cable
Take the following precautions when you conduct a performance testing.
The setting contents for each test item contains the descriptions of items which should
be further changed after initializing the factory default setting.
Setting the initialize
“4.4 Saving/Recalling the Settings“