![NEC VERSA P Service Manual Download Page 86](http://html.mh-extra.com/html/nec/versa-p/versa-p_service-manual_249133086.webp)
Options 3-23
2.
Check that the right rear cover is completely open. Slide the cover underneath the
expansion port.
3.
Place the system on the Docking Station II and carefully align the Docking Sta-
tion II's connector with the system's rear cover.
Figure Section 3-2
Docking Station II Connection
4.
Firmly press the system into the Docking Station II's connector.
5.
Place the key in the Docking Station II's lock and turn it clockwise to lock the
system securely in place.
6.
Attach one end of the Docking Station II's power cable to the Docking Station II,
and attach the other end to a properly grounded 100 to 240 VAC 50/60 Hz.
NOTE:
When the Docking Station II is attached
to the Versa P, the system's power switch is de-
activated. Power to the system is controlled us-
ing the Docking Station II's power switch.
To remove the Docking Station II, use the steps below.
1.
Turn the key to unlock the Versa lock on the Docking Station II.
2.
Check the PCMCIA port cover on the side of the system and make sure it is se-
curely closed.
3.
Pull the Versa release lever towards the front of the Docking Station II.
4.
Pull the system forward and away from the Docking Station II.
Summary of Contents for VERSA P
Page 15: ...xii Contents ...
Page 84: ...Section 3 ...
Page 93: ...Section 3 ...
Page 94: ...3 16 Options ...
Page 121: ...Troubleshooting and Repair 4 18 ...
Page 129: ...4 24 Troubleshooting and Repair ...
Page 156: ...5 14 Troubleshooting and Options for the Docking Station II ...
Page 164: ...5 20 Troubleshooting and Options for the Docking Station II ...