9-4 Upgrading Your Server
PREPARING FOR INSTALLATION AND REMOVAL
Follow the procedure below to prepare for installing or removing components.
1.
Shut down the OS.
2.
Press the POWER/SLEEP switch to power off the server (the POWER/SLEEP LED goes
off).
3.
Unplug the power cord from the AC inlet on the server (the AC Standby LEDs on the
power supply module located at rear of the server go off).
4.
Remove all the cables connected to the server on the rear panel.
5.
Make the clearance of 1m to 2m in the front and rear sides and left and right sides of the
server.
NOTE:
Make sure to disconnect the power cord from the outlet before
installing or removing the option devices. If you remove the internal
cable with the power cord being connected, the STATUS LED will light
in amber when the server is powered. Disconnect the power cord,
connect it again, and then restart the server.
Summary of Contents for Express5800/140Rf-4
Page 7: ......
Page 8: ......
Page 9: ......
Page 20: ...x This page is intentionally left blank ...
Page 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Page 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Page 226: ...5 32 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 264: ...7 18 Maintenance This page is intentionally left blank ...
Page 413: ...C 4 This page is intentionally left blank ...
Page 457: ...E 22 Installing Windows Server 2003 This page is intentionally left blank ...