Chapter 3: Installing Optional Hardware Features
Installing a 16" High Post Mount International Customer
Display
17243
1.
Locate the mounting device within 4 meters (13 ft.) of the host
workstation.
2.
Determine if the cable will be routed through the mounting surface
or along the top of the surface.
Note:
It is not necessary to disconnect the cable from the display and
remove it from inside the post. Simply slide the Mounting Plate
upward on the Display Post and then thread the cable between the
Mounting Plate and the Display Post.
Summary of Contents for 7452
Page 1: ...NCR 7452 Workstation Release 3 1 Hardware User s Guide BD20 1373 C Issue J...
Page 6: ...iv...
Page 18: ......
Page 44: ...1 26 Chapter 1 Product Overview 14406a Integrated 2x20 Customer Display...
Page 58: ...2 2 Chapter 2 Workstation Hardware Installation AC Input Selection Switch 14598 115V...
Page 74: ...2 18 Chapter 2 Workstation Hardware Installation 14566 Wrap Stand 5952 DynaKey Configuration...
Page 77: ...Chapter 2 Workstation Hardware Installation 2 21 17320 Wrap Stand 5953 DynaKey Configuration...
Page 80: ......
Page 164: ......
Page 187: ...Chapter 4 Setup 4 23 Load Previous Values Save Changes...
Page 216: ...4 52 Chapter 4 Setup...
Page 226: ......
Page 232: ...6 6 Chapter 6 BIOS Updating Procedures 4 After a successful BIOS update reboot the workstation...
Page 256: ......
Page 261: ...BD20 1373 C February 2001 Printed on recycled paper...