Description
Step
Action
-
At least 10 minutes before starting, the main supply to the dryer must be
switched on to initialize the controller and flow switch.
-
Close the dryer by-pass valve, if installed.
-
For water-cooled versions: Open the water inlet and outlet valves (customer's
installation).
Press start button (7).
-
Open the dryer air inlet valve (customer's installation).
-
Approx. 5 minutes later, open the dryer air outlet valve (customer's installation).
-
Approx. 10 minutes later, the nominal dew-point will be reached.
5.4
During operation
Control panel
Instruction book
2987 2020 00
77
Summary of Contents for VDR 2600
Page 1: ...NANO Refrigerant dryers VDR 2600 VDR 3150 VDR 3700 VDR 4200 VDR 5050 Instruction book...
Page 2: ......
Page 28: ...Figure 17 Electrical diagram Instruction book 26 2987 2020 00...
Page 58: ...Dimension drawing of water cooled dryer imperial units Instruction book 56 2987 2020 00...
Page 59: ...Dimension drawing of air cooled dryer metric units Instruction book 2987 2020 00 57...
Page 62: ...Figure 22 Air cooled dryer Instruction book 60 2987 2020 00...
Page 94: ......
Page 95: ......