
APPENDIX A – TECHNICAL CHARACTERISTICS
53
APPENDIX A – TECHNICAL CHARACTERISTICS
SUMMARY TABLE
Device
Steam Sterilizer
Classification (as per 93/42 CEE)
II
Model
Manufacturer
M.O.COM. S.r.l.
Via delle Azalee, 1
20090 BUCCINASCO (MI) - ITALY
Power supply voltage
220V – 240 V~
Frequency
50/60 Hz
Mains fuses
(6.3 x 32 mm)
F 16A 250V
On-board fuses (board type “G”)
(5 x 20 mm)
F1: T 5A 250V
(trafo secondary winding– 24V)
F2: T 2A 250V
(digital signal 5V/analog 12V)
F3: T 2A 250V
(trafo primary winding – 230V)
F4: F 200mA 250V
(door-locking protection)
F5: F 1.25A 250V
(door-locking gear motor overload)
F1 PTR: T 5A 250V (printer
protection)
On-board fuses (board type “T”)
(5 x 20 mm)
F1: T 6,3A 250V
(trafo secondary winding)
F2: T 3.15A 250V
(trafo primary winding)
F1 PTR: T 3,15A 250V (printer protection)
External dimensions (LxDxH)
480 x 660x 420 mm (excluding rear connections)
Nominal power
2300 W (10A)
Insulation class
Class I
Installation category
Cat. II
Environment of use
Internal use
Noise level
<60 db(A)
Environmental operating conditions
Temperature:
+15 °C ÷ +40 °C
Relative humidity:
max 80%, non-condensing
Altitude: max
3000 m (a.s.l.)
Net weight
about 58 kg
(empty)
about 63 kg
(empty with trays and support)
about 67 kg
(empty, with trays and supports and water at MAX level)
Sterilization chamber dimensions
(Ø x D)
250 x 450 mm
Sterilization chamber total volume
about 21 l (0.021
m
3
)
Sterilization chamber useful volume
(with tray supports inserted)
about 13 l (0.013
m
3
)
Distilled water tank capacity
(supply)
about 4.6 l
(water at MAX level)
about 0.8 l
(water at MIN level)
Sterilization programs
Available:
11 (see Appendix B)
Pre-sets:
4 (direct selection by user)
Test programs
HELIX/BD Test
Vacuum Test
Preheating time (from cold)
about 10 minutes
Serial connection
DB-9 pin
(female) connector
Bacteriological filter
(PTFE filtering element)
Porosity:
0.2
µ
m
Connection: male
1/8" NPT connector
Summary of Contents for millenium B2
Page 1: ...Quality System certified by STEAM STERILIZER OPERATING MANUAL Ed 1 Rev 5 Date January 2008...
Page 5: ......
Page 93: ...APPENDIX F DIAGRAMS 88 PLUMBING DIAGRAM Air CHAMBER Recovery tank Air Main tank...
Page 95: ...APPENDIX H NOTES PER THE OPERATOR 90 APPENDIX H NOTES PER THE OPERATOR...