
4. INSTALLATION
14
– Connect the other end of the tube to the centralized draining point, checking the seal.
NOTE
M
AKE SURE THE TUBE IS NOT BENT
,
CRUSHED OR OBSTRUCTED IN ANY WAY
.
The following diagram provides an indicative arrangement of the components:
DRAIN
CENTRALIZED
Draining tank
Connection point
of the centralized draining plant
Connection point
of the draining tank
Sterilizer
X
Support plane
This point must be lower
than the support plane
NOTE
D
IMENSION
X
IS THE HEIGHT OF THE SIDE CONNECTOR OF THE TANK ABOVE THE FLOOR
.
T
HE CONNECTION BETWEEN THE TANK AND THE CENTRALIZED DRAINING POINT
MUST
NO HIGHER THAN X
+30
MM
.
H
IGHER CONNECTIONS COULD COMPROMISE THE CORRECT
EMPTYING OF THE TANK
.
DIRECT
CONNECTION TO A
CENTRALIZED
DRAINING POINT
Follow the instructions shown below for a correct direct connection to a centralized draining
point:
– Insert the silicone tube (provided) or other suitable plastic tube on hose union A; push the
tube all the way on and lock with the plastic tie or other means;
– Cut the tube to measure, push the free end on the connection provided on the centralized
draining point and lock with the plastic tie or other means;
NOTE
M
AKE SURE THE TUBE IS NOT BENT
,
CRUSHED OR OBSTRUCTED IN ANY WAY
.
The following diagram provides an indicative arrangement of the components:
A
Clip
Was her
Clip
Pipe
To the cent ralized
draining point
Centraliz ed
draining point
S upport plane
This point must be at level lower
than the steriliz er ’s support plane
NOTE
T
HE CONNECTION POINT TO THE CENTRAL DRAIN MUST BE LOWER THAN THE
STERILIZER
'
S SUPPORT SURFACE
.
O
THERWISE
,
THE TANK MAY NOT EMPTY CORRECTLY
.
Summary of Contents for millenium B2
Page 1: ...Quality System certified by STEAM STERILIZER OPERATING MANUAL Ed 1 Rev 5 Date January 2008...
Page 5: ......
Page 93: ...APPENDIX F DIAGRAMS 88 PLUMBING DIAGRAM Air CHAMBER Recovery tank Air Main tank...
Page 95: ...APPENDIX H NOTES PER THE OPERATOR 90 APPENDIX H NOTES PER THE OPERATOR...