-
42
-
'11 • KX-T-166
(2) Flow of the check operation
Check operation is performed as follows.
Note (1) For preliminary check method, refer to “(3) Confirmation before check operation”.
(2) For details of check operation, refer to “(4) Check operation procedure”.
(3) For measures to be taken in case of NG, refer to “(5) Measures to be taken after check operation”.
Preliminary check Note (1)
Judgment of checked result Note (3)
End
NG
OK
Auto checking Note (2)
Start