192
11 TROUBLESHOOTING
11.1 CC-Link IE TSN/CC-Link IE Field Diagnostics
11
TROUBLESHOOTING
This chapter describes error contents that may occur while the I/O module is used and those troubleshooting.
11.1
CC-Link IE TSN/CC-Link IE Field Diagnostics
For CC-Link IE TSN, monitor the status and conduct an operation test.
For details on CC-Link IE TSN/CC-Link IE Field diagnostics, refer to the following.
User's manual for the master station used
Remote reset
Perform the following operation to remotely reset a selected I/O module.
Operating procedure
1.
Select a slave station to be reset and click the [Remote Operation] button.
2.
Follow the on-screen instructions and click the [Yes] button.
3.
Follow the on-screen instructions and click the [OK] button.
Precautions
■
Remote reset
Remote reset of an I/O module may cause the following because it affects communications on another station.
• Another station is disconnected.
• A synchronous communication error 1 (error code: 0102H) occurs on another I/O module using the CC-Link IE TSN
Network synchronous communication function.
■
Setting of function setting switches
When remote reset is performed, if the setting of either of the following function setting switches is different from the setting at
power-on, a Remote reset disable error (error code: 0270H) occurs, and the I/O module is not reset.
• Function setting switch 1
• Function setting switch 10
Summary of Contents for NZ2GN2B1-32D
Page 2: ......
Page 112: ...110 4 PROCEDURES BEFORE OPERATION MEMO ...
Page 193: ...10 MAINTENANCE AND INSPECTION 191 10 MEMO ...
Page 263: ...I 261 MEMO ...
Page 267: ......