6 INSTALLATION AND WIRING
6.9 Wiring of I/O Module and External Device
6.9
Wiring of I/O Module and External Device
Wiring of spring clamp terminal block
Wire to be used
The following table describes the wire to be connected to the spring clamp terminal block.
Applicable solderless terminal
The following table lists the applicable solderless terminal.
*1 When using a solderless terminal with an insulation sleeve, select the terminal whose applicable wire size is 0.75
or smaller.
Installing or removing the terminal block
The following procedures show how to install and remove the terminal block.
■
Lock and release lever positions
To make it easy to install and remove the terminal block, a three-stage positioning stopper is attached so that the lever does
not freely turn around.
When installing or removing the terminal block, turn the lever to the lock or release lever position.
Diameter
Type
Material
Temperature rating
22 to 16 AWG
Stranded
Copper
75
or more
Product
name
Terminal shape
Model
Applicable wire
size
Bar solderless terminal
tool
Contact
Bar solderless
terminal
Ferrule (with insulation
sleeve)
AI0.34-10TQ
0.34
CRIMPFOX6
PHOENIX CONTACT GmbH
& Co. KG
AI0.5-10WH
0.5
AI0.75-10GY
0.75
Ferrule (without
insulation sleeve)
A0.5-10
0.5
A0.75-10
0.75
A1.0-10
1.0
A1.5-10
1.5
View of right side of I/O module: When pulling out the terminal block
1.
Release lever position
This lever position shows the state in which the terminal
block (1) has been completely pulled out from the I/O
module. Turn from the locking lever position to the release
lever position (2) and lift the terminal block from the I/O
module.
View of right side of I/O module: When insertion of the terminal block is
complete
2.
Lock lever position
This position shows the state in which the terminal block (1)
completely fits the I/O module. Check the lock lever position
(2) and pull the terminal block lightly to check that the I/O
module completely fits the terminal block.
(1)
(2)
(2)
(1)
Summary of Contents for NZ2GN2B1-32D
Page 2: ......
Page 112: ...110 4 PROCEDURES BEFORE OPERATION MEMO ...
Page 193: ...10 MAINTENANCE AND INSPECTION 191 10 MEMO ...
Page 263: ...I 261 MEMO ...
Page 267: ......