2 - 2
2. INSTALLATION
2.2 Installation direction and clearances
CAUTION
The equipment must be installed in the specified direction. Otherwise, a fault may
occur.
Leave specified clearances between the servo amplifier and control box inside
walls or other equipment.
(1) Installation of one servo amplifier
70mm
(2.8 in.)
MITSUBISHI
OPEN
CN1A
CN1B
CNP1
CNP2
CNP3
MELSERVO
10mm
(0.4 in.)
or more
40mm
(1.6 in.)
or more
10mm
(0.4 in.)
or more
40mm
(1.6 in.)
or more
Top
Bottom
Wiring clearance
Control box
Control box
Servo amplifier
Summary of Contents for MR-J2-03B5
Page 11: ...A 10 MEMO ...
Page 15: ...4 MEMO ...
Page 21: ...1 6 1 FUNCTIONS AND CONFIGURATION MEMO ...
Page 27: ...2 6 2 INSTALLATION MEMO ...
Page 61: ...5 8 5 PARAMETERS MEMO ...
Page 73: ...7 2 7 INSPECTION MEMO ...
Page 81: ...8 8 8 TROUBLESHOOTING MEMO ...
Page 87: ...9 6 9 OUTLINE DIMENSION DRAWINGS MEMO ...
Page 91: ...10 4 10 CHARACTERISTICS MEMO ...
Page 111: ...11 20 11 OPTIONS AND AUXILIARY EQUIPMENT MEMO ...