![Mitsubishi Electric CR800 Series Instruction Manual Download Page 111](http://html.mh-extra.com/html/mitsubishi-electric/cr800-series/cr800-series_instruction-manual_238852111.webp)
12 Teaching of the Circular Arc Tracking (“A1” Program)
Operation procedure 12-99
(11)
Press the [F1] (FWD) key and execute step feed. “(5)Put workpiece on the sensor position of the conveyor”
is displayed.
Move the turntable, and place the workpiece at a position where
photoelectronic
sensor reacts.
(12)
Press the [F1] (FWD) key and execute step feed. “(6)Move workpiece to the tracking area start position by
conveyor
”
is displayed.
Move the turntable, and place the workpiece in position to enter the area where the robot starting tracking
(start position of the
Tracking starting possible area
).
Summary of Contents for CR800 Series
Page 2: ......
Page 12: ......
Page 202: ...18 Appendix 18 190 Calibration sheet ...
Page 203: ......