VIII
Troubleshooting ]
- 190 -
HWE1410A
GB
9. Pump (left side of control box)
Operation procedures
Illustrations
Operation
location
(1) Remove the four fixing screws from the
service panel (left) and then remove the
service panel (left).
(2) Remove the two fixing screws from the
service panel (top left) and then remove
the service panel (top left).
(3) Disconnect the pump connector.
Do not disconnect and connect the
pump connector while the power is on.
Doing so may cause a failure.
In ceiling
space
(4) Remove the two clips connecting the
pump and pipes and then move the
pipes by hand in the direction indicated
by the arrow in the figure.
(5) Remove the control box and then re-
move the pump wires secured by
clamps.
(6) Remove the one control box fixing
screw and then remove the control box
fixing plate.
(7) Remove the two screws securing the
pump and plate from the side (direction
of arrow) and then replace the pump.
Pump
Service panel (left)
Service panel (top left)
Clips
Pump
Control box fixing plate
0000002394.book 190 ページ 2016年1月12日 火曜日 午後4時49分
Summary of Contents for CITY MULTI CMB-WP1016V-GA1
Page 1: ......
Page 9: ...HWE1410A GB ...
Page 11: ... 2 HWE1410A GB ...
Page 27: ... I Read Before Servicing 18 HWE1410A GB ...
Page 29: ... 20 HWE1410A GB ...
Page 47: ... 38 HWE1410A GB ...
Page 55: ... III HBC Controller Components 46 HWE1410A GB 2 Power supply circuit board ...
Page 57: ... 48 HWE1410A GB ...
Page 67: ... IV Electrical Wiring Diagram 58 HWE1410A GB ...
Page 69: ... 60 HWE1410A GB ...
Page 75: ... 66 V Refrigerant Circuit GB HWE1410A ...
Page 77: ... 68 HWE1410A GB ...
Page 95: ... 86 HWE1410A GB ...
Page 117: ... VII Test Run Mode 108 HWE1410A GB ...
Page 119: ... 110 HWE1410A GB ...
Page 207: ... VIII Troubleshooting 198 HWE1410A GB ...
Page 209: ... 200 HWE1410A GB ...
Page 294: ......