[
VIII
Troubleshooting ]
- 193 -
HWE1410A
GB
14. 4-way valve body (21S4)
15. Plate heat exchanger (cooling-main side)
Operation procedures
Illustrations
Operation
location
(1) 1.Perform the operation as described in
(1) to (8) of 5.
(2) Debraze the three places indicated in
the figure and then replace the 4-way
valve with a service part. When brazing,
protect the heat insulation material to
prevent it from burning.
Below
ceiling
4- way valve service part
Operation procedures
Illustrations
Operation
location
(1) Perform the work as described in (1) to
(8) of 5.
(2) Remove the two flare nuts of the water
purge valve and air purge valve.
( and in the figure)
(3) Debraze the three places indicated in
the figure and then replace the plate
heat exchanger with a service part.
( , , and in the figure)
Below
ceiling
Plate heat exchanger
(cooling-main side) service part
0000002394.book 193 ページ 2016年1月12日 火曜日 午後4時49分
Summary of Contents for CITY MULTI CMB-WP1016V-GA1
Page 1: ......
Page 9: ...HWE1410A GB ...
Page 11: ... 2 HWE1410A GB ...
Page 27: ... I Read Before Servicing 18 HWE1410A GB ...
Page 29: ... 20 HWE1410A GB ...
Page 47: ... 38 HWE1410A GB ...
Page 55: ... III HBC Controller Components 46 HWE1410A GB 2 Power supply circuit board ...
Page 57: ... 48 HWE1410A GB ...
Page 67: ... IV Electrical Wiring Diagram 58 HWE1410A GB ...
Page 69: ... 60 HWE1410A GB ...
Page 75: ... 66 V Refrigerant Circuit GB HWE1410A ...
Page 77: ... 68 HWE1410A GB ...
Page 95: ... 86 HWE1410A GB ...
Page 117: ... VII Test Run Mode 108 HWE1410A GB ...
Page 119: ... 110 HWE1410A GB ...
Page 207: ... VIII Troubleshooting 198 HWE1410A GB ...
Page 209: ... 200 HWE1410A GB ...
Page 294: ......