![Mitsubishi Electric AE-200A Instruction Book Download Page 150](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107150.webp)
150
WT07996X02
1. Usage (PC, tablet)
This section explains how to monitor and operate the air conditioning units, LOSSNAY units, Air To Water (PWFY)
units, general equipment, and HWHP (CAHV, CRHV) units that are connected to the AE-200/AE-50/EW-50.
1-1. Monitor/Operation
1-1-1. Screen sequence
Operation status of unit groups
Unit group selected
Operation status of HWHP unit groups
HWHP unit group selected
Advanced operation
Advanced operation