![Mitsubishi Electric AE-200A Instruction Book Download Page 133](http://html.mh-extra.com/html/mitsubishi-electric/ae-200a/ae-200a_instruction-book_1810107133.webp)
133
WT07996X02
(3) To output the displayed ranking data in a CSV format, click [Download].
The file name and file format will vary as shown below, depending on the selected date range.
Item
Description
File name
Date range: Year
EM_AnnualRanking_[yyyy]_[Display range]_[Ranking graph type].csv
Date range: Month
EM_MonthlyRanking_[yyyy]-[mm]_[Display range]_[Ranking graph type].csv
Date range: Day
EM_DailyRanking_[yyyy]-[mm]-[dd]_[Display range]_[Ranking graph type].csv
File-name contents
Format
[yyyy]
The year specified in the [Date] field
[mm]
The month specified in the [Date] field
[dd]
The date specified in the [Date] field
[Display range]
Address
“A999”
Group
“G999”
Block
“B999”
Energy management block
“E999”
[Ranking graph type]
B01: Electric energy (Indoor unit)
B02: Fan operation time
B03: Thermo-ON time (Total)
B04: Thermo-ON time (Cool)
B05: Thermo-ON time (Heat)
File format
Row
Item
Date
range
Format
1st
File Type
Year
416
Month
415
Day
414
2nd
Date
Year
yyyy
Month
yyyy/mm
Day
yyyy/mm/dd
3rd
Display range
Address
“All Addresses”
Group
“All Groups”
Block
“All Blocks”
Energy
management block
“All EM Blocks”
4th
Measurement item
Address
“Address number”, Display item
Group
“Group name”
*1
, Display item
Block
“Block name”
*1
, Display item, “Target electric energy[kWh]”
*2
Energy
management block
“Ene Block name”
*1
, Display item, “Target electric
energy[kWh]”
*2
5th–
28th Data
Address
Address number, Data value
Group
Group name
*1
, Data value
Block
Block name
*1
, Data value, Target electric energy value
*2
Energy
management block
Energy management block name
*1
, Data value, Target
electric energy value
*2
*1 If the group name has not been registered, [“Group” + AE No. + “-” + group number] will appear. If the block name
has not been registered, [“Block” + AE No. + “-” + block number] will appear. If the energy management block
name has not been registered, [“Energy mgmt block” + AE No. + “-” + Energy management block number] will
appear.
*2 “Target electric energy(kWh)” and the target electric energy value will appear only when the data is displayed in
the graph.
For tenant managers
Chapter 3