9.0
Appendix 2: UL 2560 Requirements
for UPS (Uninterruptible Power
Supply)
9.1 Server and Monitor
Power consumption for the server: 350 W
Maximum power consumption for the monitor: 65 W
The UPS model is an APC Power-Saving Back-UPS Pro-1000 (120V).
•
600 W / 1000 VA
•
one 12 V / 7 Ah battery
The runtime of the UPS depends on the load applied to it. For the UPS model above, the half
load and full load runtimes are:
•
Half load (300 W): 14.5 min
•
Full load (600 W): 3.7 min
The power consumption of the server varies over time and depends on the applications that
run on it and their memory usage.
One UPS must be dedicated to the server and monitor.
9.2 Coordinator Bundles, Beacons, and Patient Units
Use the UPS described in section 9.1 for all MiCare devices. One UPS must be dedicated to
the server and monitor, and another one or more UPSes must be used to support the other
devices.
There can be more than one UPS on a site, depending on the size of the network.
9.2.1 NC-2100K Coordinator Bundle
Power consumption for one Coordinator Bundle: 1.2 W
Runtime of the UPS described in section 9.1 for one Coordinator Bundle: 60 hours
9.2.2 NC-210 Beacon
Power consumption for one NC-210 Beacon: 0.72 W
For example, the runtime for the UPS described in section 9.1 with 20 Beacons is 5 hours, and
the runtime with 40 Beacons is 2 hour 30 minutes.
9.2.3 NC-211 Beacon
Power consumption for one NC-211 Beacon: 1.08 W
For example, the runtime for the UPS described in section 9.1 with 20 Beacons is 3 hours 21
minutes, and the runtime with 40 Beacons is 1 hour 40 minutes.
9.2.4 NC-2000 Patient Unit
Power consumption for one Patient Unit with NC-4LED: 4.44 W
For example, the runtime for the UPS described in section 9.1 with 10 Patient Units is 1 hour
37 minutes.