
Maintaining the Capping Station
6-18
5
Press the
key.
6
By pressing the
keys, set the time length until
the NOZZLE PROTECT is executed.
•
Set value
:OFF, 1 to 24 hours
7
Press the
key.
• “ON Time” setting ends. Following this, set “Interval”.
• “Interval” is set to seven days as default. If changing is not needed,
press the
key several times to end the setting.
8
Select [Interval] by pressing the
keys.
9
Press the
key.
10
Press the
keys to set an execution interval
(number of days) of NOZZLE PROTECT.
•
Set value
:OFF, 1 to 14 days
11
Press the
key.
• Press the
key several times to end.
• If maintenance washing liquid has not been filled in the machine, the
screen on the right is displayed in the Step 5. Fill maintenance
washing liquid and execute procedures from the Step 1 again.
A u t o NZ L . PROT ECT
ON T i me
=
1
6 h
A u t o NZ L . PROT ECT
ON T i me
=
1
2 h
A u t o NZ L . PROT ECT
ON T i me
< e n t >
A u t o NZ L . PROT ECT
I n t e r v a l
< e n t >
A u t o NZ L . PROT ECT i n t v l
ON T i me
=
7
d
A u t o NZ L . PROT ECT i n t v l
ON T i me
=
1
0 d
MA I NT ENANCE
A u t o NZ L . CUS TODY < e n t >
* * Wa s h i n g
l i q u i d * *
* * u n - f i l l i n g u p .
* *
Summary of Contents for CJV30-100BS
Page 1: ...MIMAKI ENGINEERING CO LTD URL http www mimaki co jp D201979 13...
Page 15: ...xiv How to Read this Manual...
Page 16: ...xv...
Page 128: ...3 52...
Page 254: ...7 14...
Page 269: ...8 15 Function Flowchart 8 Appendix...
Page 283: ...8 29 Function Flowchart 8 Appendix...
Page 291: ...8 37 Function Flowchart 8 Appendix...
Page 294: ...8 40...
Page 295: ...D201979 13 19012011...