4.10 Storage of the product
To store the myDatalogNANO , activate the transport lock, by setting the "Operation mode" in the input
screen of the myDatanet server for configuring the device (see "Device-specific settings" on page 91) to
"OFF". Then activate ALOHA transmission mode (see "ALOHA transmission mode" on page 32) via the
solenoid switch so that the amended configuration is transferred to the myDatalogNANO . During this
process, all of the data that has not yet been transferred to the myDatanet server is transferred. The cables
can be removed as soon as the GPRS connection has been deactivated - indicated by the status LED going
out (see "Status LED" on page 64). Store the myDatalogNANO in its original packaging. The battery pack
remains in the device.
The myDatalogNANO is placed in energy-saving mode by activating the transport lock. However, it may still
occur that the battery pack is fully discharged if the device is stored for very long periods. Although the
configuration and the most recently determined data are always retained. The transport lock is deactivated
again by re-initiating ALOHA transmission mode (see "ALOHA transmission mode" on page 32) and the
myDatalogNANO resumes operation according to the configuration.
4.11 Obligation of the operator
WARNING:
In the EEA (European Economic Area), the national implementation of the framework
directive (89/391/EEC) as well as the associated specific directives and from these in
particular, the directive (2009/104/EC) about the minimum safety and health requirements
for use of work equipment by workers at work, each in their respective version are to be
complied with.
The operator must obtain the local operating licence and the associated documents.
In addition, the operator must comply with the local legal requirements for
l
the safety of the personnel (accident prevention measures)
l
the safety of the equipment (protective equipment and maintenance)
l
the product disposal (waste disposal law)
l
the material disposal (waste disposal law)
l
the cleaning (cleaning agents and disposal)
l
and the environmental protection amendments.
Before commissioning, the operator must ensure that the installation and commissioning – provided these
were performed by the operator himself – are in compliance with the local regulations.
4.12 Personnel requirements
Installation, commissioning and maintenance may only be completed by personnel who meet the following
conditions:
l
Qualified specialist personnel with the relevant training
l
Authorised by the facility operator
20
Rev. 02
Summary of Contents for myDatalogNANO
Page 2: ......
Page 8: ......
Page 9: ...Chapter 2 Declaration of conformity Chapter 2 Declaration of conformity Rev 02 9 ...
Page 10: ......
Page 12: ......
Page 22: ......
Page 34: ......
Page 38: ......
Page 58: ......
Page 92: ......
Page 108: ......
Page 118: ......
Page 120: ......
Page 126: ......
Page 130: ......