Manual
Corvus-eco
Starting up
22
Motor cable
If the motor cables are in-house produced, cable cross-sec-
tion, cable length and shielding have to be considered.
The cable cross-section has to be adapted to the phase cur-
rent. The cable cross-section should be calculated based on
the maximum phase current per motor phase.
For cables longer than 4m it can be necessary to adapt cable
losses by a modified configuration of the motor parameters
setumotmin
and
setumotgrad.
For the EMC-compatible fitting of the cable, a total shielding
is prescribed whereby the cable shield is connected to the
housing.
The DSUB-9 motor connector should have a metal case. The
fasten nuts of the DSUB connectors of the controller are
equipped with an UNC4-40 thread.
Upon request we manufacture motor cables according to
customer´s demands.
An incorrect wiring of the motor connection can damage
the controller.
Figure 3: Shielded motor cable with metal connector housing
Summary of Contents for Corvus ECO
Page 1: ...Version 1 0 Manual Corvus eco high resolution positioning controller...
Page 5: ...Manual Corvus eco Content 5...
Page 8: ...Chapter 1 Manual Corvus eco Introduction 8 Introduction...
Page 13: ...Chapter 2 Manual Corvus eco Starting up 13 Starting up...
Page 42: ...Manual Corvus eco Starting up 42...
Page 43: ...Chapter 3 Manual Corvus eco Functions 43 Functions...
Page 67: ...Chapter 4 Manual Corvus eco Technical data 67 Technical data...
Page 70: ...Manual Corvus eco Technical data 70 Layout and dimensions...
Page 71: ...Chapter 5 Manual Corvus eco Releasing options 71 Releasing options...
Page 77: ...Manual Corvus Releasing options 77...
Page 80: ...Manual Corvus Releasing options 80...
Page 81: ...Chapter 6 Manual Corvus eco Firmware update 81 Firmware update...
Page 83: ...Manual Corvus Firmware update 83 Update Tool...
Page 84: ...Manual Corvus Firmware update 84...
Page 85: ...Chapter 7 Manual Corvus eco Connectors 85 Connectors...