6. Assembly
ThermiStar L .. SP 01/03/10
44
Fig. 16:
Heat pump connections
Legend for Fig. 16:
Abbr.
Meaning
1
Fluid line
2
Suction gas line
3
Hot-gas line
-
Evacuate the suction, liquid and hot-gas lines. Connect the
devices to the Schrader valves for evacuation (see Fig. 10).
-
After the evacuation has been completed, open the ball valves to
allow the refrigerant to distribute. The system is operational after
the electrical installation has been made.
Summary of Contents for 98.30000-6324
Page 1: ...ThermiStar L SP 01 03 10 ...
Page 18: ...5 Technical Data ThermiStar L SP 01 03 10 18 5 2 Type plate Fig 4 Sample type plate ...
Page 21: ...ThermiStar L SP 01 03 10 5 Technical Data 21 ...
Page 39: ...ThermiStar L SP 01 03 10 6 Assembly 39 Fig 11 Sensor cable heat source intake 5 ...
Page 68: ...8 Maintenance ThermiStar L SP 01 03 10 68 8 4 Spare part drawing and legend Fig 40 ...
Page 88: ...Your notes ThermiStar L SP 01 03 10 88 ...
Page 89: ...ThermiStar L SP 01 03 10 Your notes 89 ...
Page 90: ...Your notes ThermiStar L SP 01 03 10 90 ...
Page 92: ......