
■■■■■■■■■■■■■■■■■■■■■■
5 Operation and maintenance
850 Professional IC–Anion – MSM-HC – MCS – LP Gradient
■■■■■■■■
99
■
Check whether solution emerges at the MSM-HC connecting
piece
. If one of the supply or discharge lines remained
blocked, the MSM-HC connecting piece
(order number 6.2835.010).
4 Cleaning the MSM-HC rotor A
■
Clean the sealing surface of the MSM-HC rotor A
ethanol using a lint-free cloth.
5 Inserting the MSM-HC rotor A
CAUTION
An incorrectly inserted MSM rotor A
destroyed
during start-up.
■
into the MSM-HC housing
in such a way that the tubing connections on the rear of
MSM-HC rotor A fit into the corresponding recesses inside the
MSM-HC housing and one of the three holes of the MSM-HC
rotor A is visible from below in the slot
of the MSM-HC
housing.
■
is correctly inserted, its sealing sur-
face will be approx. 4 mm within the MSM-HC housing
. If
this is not the case, the MSM-HC rotor A must be moved into the
right position from below using a sharp object (e.g. screwdriver).
6 Cleaning the MSM-HC connecting piece
■
Clean the sealing surface of the MSM-HC connecting piece
with ethanol using a lint-free cloth.
7 Inserting the MSM-HC connecting piece
■
Insert the MSM-HC conencting piece
into the MSM-HC
housing
in such a way that the connector
1
is on top and
the three pins of the connecting piece fit into the corresponding
recesses on the MSM-HC housing
■
Reattach the union nut
onto the coupling and tighten.
8 Connecting and conditioning the MSM-HC
■
Reconnect the MSM-HC to the IC system.
■
Before switching the MSM-HC over for the first time, rinse the
three suppressor units with solution for 5 minutes.