34
Figure 4.42: Examples of Leak’s & Power measurement results
4.1.13 Discharging
Time
Figure 4.43: Discharging Time test menu
Test results / sub-results
t ................. Discharging time
Up ............. Peak voltage of supply during the test
Test parameters
Limit voltage
Limit U [60 V, 120 V]
Output connections
Output [External, Socket]
Test mode
Mode [Manual, Auto]
Delay time for AUTO mode Delay [2 s ... 30 s]
Test limits
Discharging time limit
Limit(t) [1 s, 5 s ]
Measuring principle (Output = External)
The measuring principle of the Discharging time function is as following:
Phase
The device under test is connected to supply voltage via an external socket. The
instrument monitors the voltage (on supply or internal connections) and internally
stores the peak voltage value.