MI 3394 CE MultiTesterXA
Single
tests
33
YES: The instrument measures leakage current in two sequential
steps with 5 s delay in between. The phase voltage is firstly
applied to the right live output of the mains test socket and
secondly to the left live output of the mains test socket.
NO: The phase voltage is applied only to the right live output of the
mains test socket.
Output connections
[Socket L–N, Socket L,N – PE,P]
Test limits
H Limit (P)
H limit [Off, 10 W ... 3.50 kW ]
L Limit (P)
L limit [Off, 10 W ... 3.50 kW]
H Limit (Idiff)
H limit [Off, 0.25 mA ... 15.0 mA ]
L Limit (Idiff)
L limit [Off, 0.25 mA ... 15.0 mA ]
H Limit (Itou)
H limit [Off, 0.25 mA ... 15.0 mA ]
L Limit (Itou)
L limit [Off, 0.25 mA ... 15.0 mA ]
Test circuit
Figure 4.41: Measurement of Leak’s and Power
Leak’s & Power measurement procedure
Select the
Leak’s & Power
function.
Set test parameters / limits.
Connect device under test to mains test socket and optionally to P/S terminal.
Start measurement.
Measurement can be stopped manually or by timer.
Save results (optional).