
6
INSTRUCTION MANUAL
– BALER Z562
Part II
3.5
Control-Panel Operation ................................................................................... 8
3.5.1
Switching on the panel .................................................................................. 9
3.5.2
Switching Off The Panel .............................................................................. 10
3.5.3
Selecting The Bale-Binding Option ............................................................. 10
3.5.4
Delay-Time Change .................................................................................... 10
3.5.5
Resetting ..................................................................................................... 10
3.5.6
Zeroing The Workday Counter .................................................................... 11
3.6
Hydraulic Installation ....................................................................................... 11
3.6.1
The Standard Hydraulic System .................................................................. 12
3.6.2
The Optional Hydraulic System ................................................................... 14
3.7
The Electrical System ..................................................................................... 15
3.8
Windrow Collection ......................................................................................... 16
3.8.1
The Principles Of Operation ........................................................................ 16
3.8.2
Operations Description ................................................................................ 16
3.8.3
Straw Collection .......................................................................................... 18
3.9
Removing The Accumulated Material ............................................................. 18
3.9.1
Removing the Accumulated Material ........................................................... 19
3.9.2
Removing the Accumulated Material on The Rotor ..................................... 19
3.10
Ending Operations ....................................................................................... 19
4
Maintenance and Adjustment ................................................................................. 20
4.5
Pick-Up-Wheels Adjustment ........................................................................... 22
4.6
Adjusting The Drive-Chain Tensioning (Every 10 Hrs Of Work) ..................... 22
4.6.1.
Adjusting The Pick-Up Chain Tension Of The Baler To The Feeding Roller
23
4.7
Pick-Up Cam Adjustment ................................................................................ 24
4.8
Replacing The Locking Bolt In The Pick-Up ................................................... 26
4.9
Replacing The Locking Bolt In The Supplying Unit ......................................... 27
4.10
Adjusting The Degree Of Compaction ........................................................... 28
4.11
Adjusting The Twine-Binding Device ............................................................. 30
4.11.1
Sharpening The Twine Blades .................................................................... 30
4.12
Adjusting The Net-Binding Device ............................................................... 30
4.13
Adjusting The Cover Stop Valve ................................................................. 31
4.14
Adjusting The Lock ...................................................................................... 32
4.15
Sharpening The Blades ............................................................................... 33
4.16
Transmission-Fluid Exchange (Once A Year) ............................................. 35
4.17
Lubrication ................................................................................................... 36