
42
INSTRUCTION MANUAL
– BALER Z562
4.17.3 Lubricating the Bearings
The Z562 baler can be fitted with an integrated lubrication system of bearings. The
strips (1) with grease nipples (2) facilitate the lubrication of machine bearings. The strips are
located on the left- and right-hand side of the baler.
Figure 55.
The central lubrication of bearings on the left-hand side of the baler
4.18 Tyres Inspection (Every 30 Days Of Work)
Schedule regular checks of the tyre pressures and ensure they are suitable for the
respective tyre.
WARNING!
Important. Check the tightening of the wheel bolts regularly. The tightening
torque should be in accordance with Table 4.
WARNING!
Important. Wheel and tyre repairs may be performed only by skilled staff
using the proper equipment.
WARNING
WARNING