34
6 - HYDRAULIC CONNECTION
PLUMBING CONNECTION
IMPORTANT!
The connection of the stove to the plumbing system must be carried out ONLY by specialised personnel capable of
carrying out state of the art installation, in compliance with the standards in force in the country of installation.
The company will not be held responsible for damage to persons or things in the event of failed operation if the
aforementioned warning is not complied with
It is important that ONLY qualified engineers are used to fit and commission the appliance in ALL cases. The installing
engineer MUST hold a QCF recognised biomass qualification. Any company using sub-contractors MUST ensure they also
hold the relevant qualifications (ONLY FOR UK).
CONNECTION DIAGRAM
A = 3/4”M BOILER DELIVERY
B = 1/2”M BOILER DISCHARGE
C = 3/4”M BOILER RETURN
A = BOILER DELIVERY
B = BOILER DISCHARGE
C = BOILER RETURN
D = VENT
E = KLIXON 95°C OVERLOAD PROTECTOR
F = H2O TEMPERATURE PROBE
G = KLIXON 110°C OVERLOAD PROTECTOR
H = 3 BAR 1/2” SAFETY VALVE