26
4-INSTALLATION AND ASSEMBLY
WOODEN BEAM INSULATION
If you wish to mount a wooden beam, it must be protected with adequate insulation from the hot parts in order to prevent the risk of fire
or damage to the cladding.
STANDARD CLADDING ASSEMBLY
The installation guide found in each specific cladding must be referred to for the assembly of MCZ product specific claddings.
FRAME ASSEMBLY
Once the cladding and/or the plasterboard wall is set up, fit the frame.
This frame is meant for finishing and covering the gap between the metal structure of the product and the cladding.
The four screws for fixing the frame are already screwed to the lateral columns. Simply open the door of the product, insert the frame as
shown in the figure, loosen the screws fixed to the columns and tighten them fastening the frame to the structure.
1 - INSULATION APPLIED OR TO BE APPLIED
2 - WOODEN BEAM
3 - MARBLE OR OTHER MATERIAL
FRAME
SCREWS
LATERAL COLUMNS