Chapter 3
INSTALLATION AND USE MANUAL
page
21
Installation and fitting
Technical service - Rights reserved MCZ S.p.A. - Reproduction prohibited
3.8.
MAKING THE ELECTRICAL CONNECTIONS
Connect the power cord to the back of the product first. Then connect
it to
an electrical wall socket that is always accessible
.
. If this is not possible, during installation provide suitable devices for
disconnection from the power supply network, in compliance with
national standards on electrical systems.
Once the power cord has been connected, and all installation and
cladding is complete, place the switch in the position
(I).
The lighted
button will come on and also the LED of the emergency panel will come
on steady red.
When not in use it is advisable to unplug the power
cord.
3.9.
REALIZATION OF CLADDING
The product must be fully tested before the cladding
is placed. MCZ shall not be held liable for any
damage to the cladding if abnormal operation occurs
that were not checked before cladding the unit.
You MUST check the seal of all tubes where smoke
passes (smoke connection, gaskets and insertion in
flue pipe) before cladding.
BEFORE YOU START CLADDING OF THE UNIT, READ
CHAPTER 5.2 “OPERATING TEST”
The fireplace stove and the parts of the cladding must be attached to
one another
WITHOUT COMING INTO CONTACT WITH THE
STEEL STRUCTURE
to prevent transmission of the heat to the marble
and/or stone, and to allow normal thermal dilation. Use care with wood
finsihes such as crossbeams or shelves.
We recommend making the hood liner in fire-resistant
plasterboard
of 15/20 mm. thickness, with a self-supporting frame in
galvanised profile, so as not put weight on components of the cladding
(such as wooden beams and marble architraves) which do not have a
load-bearing structure and
to make it easy to work in the event of
future anomalies and/or maintenance.
Dry install the fire bed of the
cladding, leaving an aperture of
1 cm
between the fireplace stove and the fire bed to provide insulation.
3.10.
INSULATING A WOODEN BEAM
The wood beam must be protected with adequate insulation from
heated parts to prevent the risk of fire or damage of the cladding.
3.11.
INSTALLATION OF STANDARD MCZ CLADDING
For the installation of cladding specifically designed for the MCZ
PowerBox, the installer should refer to the use and installation manual
included with each specific cladding.
THERMAL PROTECTION OF CROSSBEAM
1.
Insulation applied or to be applied.
2.
Wood beam
3.
Marble or other material
1
1
3
10
2