Example of Selection:
The mini chiller has a piping network of diameter 1-1/4". The pipes are to be insulated with
Armaflex. The pipes run through a ceiling space with a temperature of 38°C and 85% RH.
Determine the minimum insulation thickness required to prevent condensation if the chilled water
temperature is at:
a.
7°C
b. 2 °C
The Armaflex insulation has a k-value of 0.0374 W/m.K. The tubular insulation has a black
surface, thereby use a h-value of 9 W/m.K. By entering into the sizing Excel spreadsheet
programme,
we
calculate:
1. For a 7°C water temperature, the insulation must be at least 1 inch thick.
2. For a 2°C water temperature, the thickness required is 1.1 inch.
It is recommended that the next size up to be selected to provide some safety factor for the
selection.
If a pre-insulated pipe is used instead, what is the thickness required?
Ignoring the effect of the external cladding, and entering again into the programme with a k-value
of 0.025 W/m.K, we have the minimum thickness:
1. For 7°C water: 0.7 inch
2. For 2°C water: 0.8 inch
Note that polyurethane is a better thermal insulator compared with the Armaflex, therefore the
thickness
is
lower.
Section 7
Page 99
Summary of Contents for AC 40A
Page 1: ...AM MAC ...
Page 153: ...Appendix 1 ...
Page 154: ...Appendix 2 Appendix 2 ...
Page 157: ...GRAPH OF PRESSURE DROP VS FLOW FOR VARIOUS C V RATINGS Appendix 5 1 ...
Page 158: ......
Page 159: ...Water Capacity Graph Appendix 5 2 ...
Page 160: ...CHART 3 FRICTION LOSS FOR CLOSED PIPING SYSTEMS Appendix 6 1 ...
Page 161: ...CHART 4 FRICTION LOSS FOR OPEN PIPING SYSTEMS Appendix 6 2 ...
Page 162: ...CHART 5 FRICTION LOSS FOR CLOSED AND OPEN PIPING SYSTEMS Appendix 6 3 ...
Page 168: ...Appendix 8 Appendix 8 ...
Page 169: ...Appendix 8 1 ...
Page 170: ...Appendix 8 2 ...
Page 171: ...Appendix 8 3 ...
Page 172: ...Appendix 8 4 ...
Page 173: ...Appendix 8 5 Appendix 8 5 ...
Page 174: ...Appendix 8 6 Appendix 8 6 ...
Page 175: ...Appendix 8 7 Appendix 8 7 ...
Page 176: ...Appendix 9 ...
Page 178: ...Appendix 11 1 Appendix 11 1 ...
Page 179: ...Appendix 11 2 Appendix 11 2 ...
Page 180: ...Appendix 13 ...
Page 181: ...Appendix 13 1 ...
Page 182: ...Appendix 14 Appendix 14 ...
Page 183: ...Appendix 15 1 Appendix 15 1 ...
Page 186: ...Appendix 17 Appendix 17 ...
Page 187: ...Appendix 18 ...
Page 188: ...CE20DW CE25DW Note PRESSURE DROP CORRECTION FACTOR 1 2947 0 0021 EWTºF Appendix 19 ...
Page 189: ... 2003 McQuay International 603 55194922 www mcquayup com ISO 9002 REGISTERED ...