198
4. Apply heat to copper tubing first and move flame
toward valve socket.
A. Heat copper tubing for approximately 10 to
15 seconds then direct the heat to the
solenoid socket.
B. Heat the solenoid socket for 2 to 5 seconds
and apply silver solder to joint.
C. Do not attempt to fill solenoid flange with
solder. Solder will draw into socket.
5. Install new liquid line drier.
6. Leak check joints by pressurizing system with
150
psig nitrogen.
7. Evacuate and re-charge system to nameplate
charge.
8. Reinstall coil (using a twisting motion) and attach
wiring.
SV3071
MAX. 1300°F
(700°C)
SV3073
Summary of Contents for Q130 series
Page 2: ......
Page 16: ...16 Part Number 8001119 10 19 SM50 MODEL SERIAL NUMBER PLATE ...
Page 36: ...36 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 98: ...98 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 202: ...202 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 234: ...234 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 235: ......