PROCEDURE
Step 1
Complete each item individually in the
“Operational Analysis” column.
Enter check marks (
3
) in the boxes.
Each time the actual findings of an item in the
“Operational Analysis” column matches the published
findings on the table, enter a check mark.
Example: Freeze cycle suction pressure is determined
to be low. Enter a check mark in the “low” box.
Perform the procedures and check all information
listed. Each item in this column has supporting
reference material.
While analyzing each item separately, you may find an
“external problem” causing a good refrigerant
component to appear bad.
Correct problems as they
are found.
If the operational problem is found, it is
not necessary to complete the remaining
procedures
.
Step 2
Add the check marks listed under each of the
four columns. Note the column number with the
highest total and proceed to “Final Analysis.”
NOTE: If two columns have matching high numbers, a
procedure was not performed properly and/or
supporting material was not analyzed correctly.
Summary of Contents for Q130 series
Page 2: ......
Page 16: ...16 Part Number 8001119 10 19 SM50 MODEL SERIAL NUMBER PLATE ...
Page 36: ...36 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 98: ...98 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 202: ...202 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 234: ...234 Part Number 8001119 10 19 This Page Intentionally Left Blank ...
Page 235: ......