Crane operation
11.1 Before operating the crane
11 - 12
3 112 993 en
Operating manual GMK 6400
1
2
.0
7.
201
3
11.1.5
Earthing the load
Even if the truck crane is already earthed (
p. 12 - 13), the load may
become charged with static electricity. For example, if a hook block with
synthetic sheaves or non-conducting sling gear is used.
Use electrically conducting material for earth-
ing.
•
Hammer a metal rod (
4
) (length approx.
2.0 m [6.6 ft]) at least 1.5 m (5 ft) deep into
the ground.
•
Dampen the soil around the metal rod (
4
) for
better conductivity.
•
Clamp an insulated cable (
3
) to the metal rod
(
4
) (cross-section of at least 16 mm
2
[0.025 in
2
]).
•
Clamp the other end of the cable (
3
) to a
metal rod (
2
) with an insulated grip (
1
).
•
Hold the metal rod by the insulated grip (
1
).
•
To earth, touch the load with the metal rod.
B
Risk of accident due to electric shock
Always earth the load before operating the crane:
– Near strong transmitters (radio transmitters, radio stations, etc.)
– Near high-frequency switchgears
– If a thunder storm is forecast
If the load is charged with static electricity, you must always earth the load
before touching it.
B
Risk of accident due to electric shock
Ensure that the connections between the cable and the metal rods are elec-
trically conductive. When earthing, hold the metal rod only by the insulated
handle and keep a sufficient distance to the metal rod in the ground.
Summary of Contents for GROVE GMK 6400
Page 1: ...3 112 993 en 12 07 2013 Operating manual Part 1 Driving ...
Page 9: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 10: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 12: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 18: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 26: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 28: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 32: ...Overview 1 4 Terms used 1 4 3 112 993 en Operating manual GMK 6400 12 07 2013 1 4 Terms used ...
Page 34: ...Overview 1 4 Terms used 1 6 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 64: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 76: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 142: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 338: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 383: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 8 8 Index ...
Page 384: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 386: ...Index 8 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 404: ...Index 8 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 405: ......
Page 406: ......
Page 407: ...3 112 993 en 12 07 2013 Operating manual Part 2 Crane operation ...
Page 415: ...Correction sheet GMK6400 3 302 804 en 7 27 08 2018 Hook tackle Reeving A 1x ...
Page 416: ...27 08 2018 8 3 302 804 en Correction sheet GMK6400 Blank page ...
Page 418: ...06 06 2014 2 3 113 115 en Correction sheet GMK6400 Blank page ...
Page 424: ...22 01 2014 6 3 113 060 en Additional page GMK6400 Blank page ...
Page 432: ...3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 434: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 550: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 856: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 868: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 937: ...Operating manual GMK 6400 3 112 993 en 12 07 2013 15 15 Index ...
Page 938: ...3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 940: ...Index 15 2 3 112 993 en Operating manual GMK 6400 12 07 2013 Blank page ...
Page 958: ...Index 15 20 3 112 993 en Operating manual GMK 6400 12 07 2013 ...
Page 959: ......
Page 960: ......