–84–
A. Pull vacuum to 1000 microns. Break the vacuum
with dry nitrogen and sweep the system. Pressurize
to a minimum of .35 bar.
B. Change the vacuum pump oil.
C. Pull vacuum to 500 microns. Break the vacuum
with dry nitrogen and sweep the system. Pressurize
to a minimum of .35 bar.
D. Change the vacuum pump oil.
E. Pull vacuum to 500 microns. Run the vacuum pump
for 1 hour additional hour.
Charge the system with the proper refrigerant to the
nameplate charge.
Operate the ice machine for one hour. Then, check
the pressure drop across the suction line filter-drier.
F. If the pressure drop is less than .14 bar, the filter-
drier should be adequate for complete cleanup.
G. If the pressure drop exceeds .14 bar, change the
suction line filter-drier and the liquid line drier.
Repeat until the pressure drop is acceptable.
Operate the ice machine for 48-72 hours. Replace
the suction line and liquid line drier if necessary.
Important
Dry nitrogen is recommended for this procedure.
This will prevent CFC release.
Summary of Contents for EC18
Page 2: ......
Page 6: ...This Page Intentionally Left Blank ...
Page 12: ...This Page Intentionally Left Blank ...
Page 14: ... 2 This Page Intentionally Left Blank ...
Page 24: ...12 Part Number 80 1479 3 10 10 Evaporator Ice Chute Spray Bar Spray Nozzles Toggle Switch ...
Page 42: ...30 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Page 74: ...62 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Page 75: ...Part Number 80 1479 3 10 10 63 ...
Page 100: ... 87 This Page Intentionally Left Blank ...
Page 101: ... 88 This Page Intentionally Left Blank ...
Page 175: ... 162 This Page Intentionally Left Blank ...
Page 181: ... 168 ...
Page 182: ......
Page 183: ......