26
Part Number 80-1479-3 10/10
1. Freeze Cycle
Turn the toggle switch to ON. The compressor, and
water pump will energize, starting the freeze cycle.
The pump sprays water into the inverted cups. The
water freezes layer by layer, until an ice cube forms in
each cup.
At the same time the compressor starts, the
condenser fan motor (air-cooled models) is supplied
with power throughout the freeze and harvest cycles.
The freeze cycle continues and the evaporator
thermostat reaches the adjusted set point.
No Timer
A harvest cycle starts
Mechanical Timer
The thermostat energizes the timer motor and the cam
starts to turn. When the cam cycles through the preset
freeze time the relays change position and the harvest
cycle is initiated.
SCR Timer
The thermostat energizes the time delay relay. When
the timer reaches setpoint (11.5 minute factory setting)
the harvest cycle is initiated.
Summary of Contents for EC18
Page 2: ......
Page 6: ...This Page Intentionally Left Blank ...
Page 12: ...This Page Intentionally Left Blank ...
Page 14: ... 2 This Page Intentionally Left Blank ...
Page 24: ...12 Part Number 80 1479 3 10 10 Evaporator Ice Chute Spray Bar Spray Nozzles Toggle Switch ...
Page 42: ...30 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Page 74: ...62 Part Number 80 1479 3 10 10 This Page Intentionally Left Blank ...
Page 75: ...Part Number 80 1479 3 10 10 63 ...
Page 100: ... 87 This Page Intentionally Left Blank ...
Page 101: ... 88 This Page Intentionally Left Blank ...
Page 175: ... 162 This Page Intentionally Left Blank ...
Page 181: ... 168 ...
Page 182: ......
Page 183: ......