Enlarge XO holes with X-mas tree
bit so that white collar washers can
fit.
Unsolder tweeter output wires and
replace with new tweeter wires
that are 45” long.
Slide the upper XO in to the upper
cabinet.
Align the holes in the XO board
with the (6) studs that are
mounted to the Q7-13 plate.
Lower the XO down over the (6)
studs.
Once the XO is sitting on the
spacers assemblies. Slowly start to
remove and replace each stud.
Each stud should be replaced with
a ¼-20 1 ¾” fastener with a ¼” x
0.250 molded nylon top-hat
washer and red Loctite.
Once the upper XO is mounted
firmly in place, start routing the
wires. This Xo is responsible for
midrange and tweeter inputs and
outputs.
Route both wires down through
the large hole in the center of the
Q7-13 plate. Leave enough slack to
create a “service loop” which is 2”
loop of extra slack wire.
52 |
P a g e
Summary of Contents for Q7
Page 1: ...Q7 Assembly Procedure 1 P a g e...
Page 7: ...6 P a g e...
Page 12: ...10 P a g e...
Page 17: ...14 P a g e...
Page 19: ...15 P a g e...
Page 23: ...18 P a g e...
Page 25: ...19 P a g e...
Page 38: ...31 P a g e...
Page 48: ...Install BH5 in all places shown 41 P a g e...
Page 49: ...42 P a g e...
Page 69: ...62 P a g e...